TY - JOUR
T1 - Seeking the Optimisation of Public Infrastructure Procurement with NEC4 ECC
T2 - A Peruvian Case Study
AU - Yabar-Ardiles, Oscar
AU - Sanchez-Carigga, Carlos
AU - Espinoza Vigil, Alain Jorge
AU - Guillén Málaga, Milagros Socorro
AU - Milón Zevallos, Andreé Alexis
N1 - Publisher Copyright:
© 2023 by the authors.
PY - 2023/11
Y1 - 2023/11
N2 - The modern civil engineering and construction sector requires collaborative work environments, learning and trust among all parties involved, qualities that are absent in the Peruvian reality. This study, which is based on an extensive literature review, investigates this challenge. The study reflects upon (i) the current situation of public works procurement in Peru and (ii) the New Engineering Contract (NEC), which has recently been implemented in Peruvian Special Public Infrastructure Projects. Comparisons are presented between the characteristics, documentation and roles of these two systems, with the purpose of understanding and representing the advantages, disadvantages and possibilities of integrating the good contractual management practices of the NEC4 Engineering and Construction Contract into the traditional Peruvian State Contracting Law (Ley de Contrataciones del Estado: LCE). The research is validated through the case study of a high-impact road infrastructure project in the city of Arequipa, Peru, which revealed five main deficiencies from Peruvian procurement processes which hinder good contractual management and, also, facilitated an initial assessment of the challenges and improvement opportunities in public infrastructure procurement. Thus, a contribution is made to closing the knowledge gap regarding the implementation of the NEC4 ECC in public sector works.
AB - The modern civil engineering and construction sector requires collaborative work environments, learning and trust among all parties involved, qualities that are absent in the Peruvian reality. This study, which is based on an extensive literature review, investigates this challenge. The study reflects upon (i) the current situation of public works procurement in Peru and (ii) the New Engineering Contract (NEC), which has recently been implemented in Peruvian Special Public Infrastructure Projects. Comparisons are presented between the characteristics, documentation and roles of these two systems, with the purpose of understanding and representing the advantages, disadvantages and possibilities of integrating the good contractual management practices of the NEC4 Engineering and Construction Contract into the traditional Peruvian State Contracting Law (Ley de Contrataciones del Estado: LCE). The research is validated through the case study of a high-impact road infrastructure project in the city of Arequipa, Peru, which revealed five main deficiencies from Peruvian procurement processes which hinder good contractual management and, also, facilitated an initial assessment of the challenges and improvement opportunities in public infrastructure procurement. Thus, a contribution is made to closing the knowledge gap regarding the implementation of the NEC4 ECC in public sector works.
KW - NEC4 ECC
KW - collaborative philosophy
KW - contractual management
KW - public infrastructure procurement
UR - http://www.scopus.com/inward/record.url?scp=85178268428&partnerID=8YFLogxK
U2 - 10.3390/buildings13112828
DO - 10.3390/buildings13112828
M3 - Article
AN - SCOPUS:85178268428
SN - 2075-5309
VL - 13
JO - Buildings
JF - Buildings
IS - 11
M1 - 2828
ER -